Entry portico, finished and stained. October 2024.

Costs and durations are still being added.

The work below is real and the dates come off the photographs. As each job gets its final cost and change order count confirmed, it moves into the Projects section of the admin and this placeholder retires.

Recent work in Star Valley and Jackson Hole.

For what this kind of work runs before you call, see our published cost ranges.

A timber framed entry portico on a log home, roof deck on and trim complete

Timber entry portico

Post and beam entry built onto an existing log home. Posts and pad on 23 July, framed and decked by 7 August, stained and roofed that autumn.

  • 14 days to framed
  • Finished Oct 2024
Interior of a log home with an open stair, steel rod rail and a chandelier over the entry

Log home interior

Interior finish on a log home including an open stair with a shaped log stringer and steel rod rail.

  • Feb to Oct 2024
  • Stair built on site
A timber framed covered bay being added to the side of a metal building with a telehandler on site

Covered bays, metal building

Timber structures added to a metal building across two seasons. The client came back a year later for the second bay.

  • Two phases
  • Repeat client

Detached building / May 2026

Walls up on the 15th. Wrapped on the 27th.

Every date below comes off the photograph itself, not off a marketing calendar.

Exterior walls standing on the new slab
15 MayWalls up
Wall sheathing on, gable framing started
16 MaySheathed
Roof trusses set and braced
16 MayTrusses set
Trusses complete across the full span
17 MaySpan complete
Roof sheathing going on from the eave up
17 MayRoof decking
Roof decked, skid steer staged for the next lift
26 MayRoof closed
Shell closed in, evening light on the gable end
26 MayShell closed
Long elevation with the porch bay framed
26 MayPorch bay
House wrap on, ready for siding
27 MayWrapped